Glasgow Daily Times, Glasgow, KY

December 6, 2013

2:55 AFTERNOON UPDATE: Transportation department lists upcoming road work

Special report
Associated Press

BOWLING GREEN — The Kentucky Department of Transportation has released road work zones for Dec. 9-13.

I-65

·        There will be rolling roadblocks from mile marker 52 (Cave City) to mile marker 58 (Horse Cave) Monday through Friday from 11 a.m. to 5 p.m.





Barren County

·        KY70/KY 90- Road widening construction work will create lane restrictions on KY 90 from mile point 0  (I-65)to mile point 1 (The Dollar General Store) Monday through Friday. Motorists need to slow down and watch for flaggers.



·        KY 90- Sidewalk and gutter work will be taking place from mile point 11.5 (Louie B. Nunn Parkway) to mile point 14.5 (Willrich Circle).  The work will take place from 6 a.m. to 6 p.m. and flaggers will be used as necessary.



·        Outer Loop- Parkway traffic traveling westbound is one lane and restricted to 12’ wide between mile marker 8 and mile marker 10. Crews will be stopping traffic at different times during the day for construction equipment crossing from 6 a.m. to 6 p.m. Motorist need to slow down when approaching this area.





Metcalfe County

·        KY 163- Shoulder work from mile point 0 to mile point 4 will be taking place from 6 a.m. to 6 p.m.





Todd County

·        KY 178- There may be occasional lane restrictions from mile point 0 to mile point 3. Flaggers will be used.