July 04, 2009 03:09 pm
—
A worker with Charles DeWeese Construction uses a mini track hoe to break up sidewalk concrete along west Main Street in front of West Main Plaza on Wednesday in Glasgow. Totally redoing the sidewalks from U.S. 31E bypass to the Public Square could take as much as three months.
Copyright © 1999-2008 cnhi, inc.
Photos
A worker with Charles DeWeese Construction uses a mini track hoe to break up sidewalk concrete along west Main Street in front of West Main Plaza on Wednesday in Glasgow. Totally redoing the sidewalks from U.S. 31E bypass to the Public Square could take as much as three months. Glasgow Daily Times